Demo AI Assistant
Demo: Select a project. In the full app you can ask questions about your project CD set and add sheet chips (max 5 per request).
Summarize egress and ADA issues from the latest QC run for Summit Surgery Center and which sheets they're on.
Based on the latest QC run for Summit Surgery Center, here are the egress and ADA-related issues by sheet.
Issues by sheet
| Sheet | Issue | Severity | Notes |
|---|---|---|---|
| A-102 | Egress path not continuous to exit | Critical | Room 102 egress does not lead to exit without passing through another tenant space |
| A-104 | Door width does not meet ADA minimum (30" vs 32" required) | Critical | Clear width at door on plan is 30" |
| A-104 | Toilet room clear floor space under 30" x 48" at lavatory | Major | ADA 606.2 |
| A-104 | Grab bar length insufficient at water closet | Major | Verify side grab bar meets 42" minimum |
| A-103 | Unlabeled exit sign at egress door to stair | Major | Add exit sign per IBC 1013.1 |
Summary
| Severity | Count |
|---|---|
| Critical | 2 |
| Major | 3 |
| Total | 5 |
Recommendations:
- Resolve both critical items before issuance (egress path and ADA door width).
- Add exit sign callout on A-103 and verify grab bar/clear floor space dimensions on A-104.
- Consider a focused ADA review pass on all toilet rooms.
Compare sheet A-102 with the door schedule on A-106 and list any missing or inconsistent doors.
I've compared A-102 (Floor Plan) with A-106 (Door Schedule). Findings below.
Door schedule comparison
| Door ID | On plan (A-102) | On schedule (A-106) | Type | Status |
|---|---|---|---|---|
| D101–D107 | ✓ | ✓ | 3068 / 90 min | Match |
| D104 | Pair shown | Single (D104) listed | 2868 | Missing second leaf on schedule |
| D108 | No rated callout | 1-hr fire-rated | 20 min | Add rated frame note on plan |
| D109–D112 | ✓ | ✓ | 3068 | Match |
Issues
- Room 104 – Plan shows a pair of doors; schedule lists only one (D104). Add the second leaf to the schedule or note one as fixed.
- D108 (corridor exit) – Schedule shows 1-hour fire-rated assembly; plan has no rated frame callout. Add a note or symbol for the rated assembly on A-102.
Summary
- Matches: 10 of 12 door references align.
- Action items: 1 coordination gap (D104 pair), 1 plan note needed (D108 rating).
Demo: input disabled. In the full app you can type and add sheet chips (max 5).