Back to Riverside Medical Office

QC Run - 2/4/2026 / QC Report

Generated on February 4, 2026

TOTAL ISSUES

14

CRITICAL

2

Must fix before issuance

MAJOR

7

OVERALL SCORE

71%

Detailed Issues

Filter:

Egress path not continuous to exit

A-102Page 8CRITICAL

Egress from Room 102 passes through another tenant space before reaching exit.

Recommended Fix:

Provide dedicated egress or revise separation per IBC Ch. 10.

Toilet room clear floor space under 30" x 48"

A-104Page 14CRITICAL

Lavatory does not show 30" x 48" clear floor space per ADA 606.2.

Recommended Fix:

Adjust fixture layout or provide clear floor space per code.

Dimension string does not close

A-301Page 16MAJOR

Exterior wall dimension on A-301 is missing one segment; total does not match grid.

Recommended Fix:

Add missing dimension or correct total to match grid.

Door schedule inconsistency

A-602Page 18MAJOR

Door 204C is in door schedule on sheet A-602 but not shown on floor plan sheet A-102.

Recommended Fix:

Add door 204C to floor plan or remove from schedule; align schedule and plans.

Wall type baseline conflict (A-102 vs A-103)

A-102Page 18MAJOR

A-102 general notes state "All walls S04E unless noted"; A-103 states "All walls S03E unless noted." Conflict can cause incorrect wall construction.

Recommended Fix:

Confirm intended typical wall type and revise A-102/A-103 notes so they are consistent.

Wall type inconsistent between floor and dimension plan

A-103Page 18MAJOR

Typical wall type differs between floor plan (S04E) and dimension plan (S03E) notes.

Recommended Fix:

Align typical wall type in both plan notes.

Code edition mismatch

A-103Page 19MAJOR

Dimension plan legend references 2018 IBC (e.g. Sections 509, 707). Adopted code for the project is 2021 IBC.

Recommended Fix:

Update sheet legends to 2021 IBC and confirm section numbers remain correct.

Wrong jurisdiction in roof plan note

A-301Page 21MAJOR

Roof plan note requires "Town of Gilbert" approval for RTU visibility. Project is Riverside, CA—likely template carryover.

Recommended Fix:

Replace with correct AHJ (Riverside, CA) or remove; use project-specific AHJ only.

Door schedule rating vs comment conflict

A-602Page 34MAJOR

Door 205A shows "1-HOUR RATED" in assembly column but comment says "2Hr Rated Door." Internal conflict with suite separation requirements.

Recommended Fix:

Confirm required fire rating and revise schedule so rating and comments match; verify hardware.

Door schedule references missing hardware sheets

A-602Page 34MAJOR

A-602 note "REFER TO A-606, A-607 FOR HARDWARE SCHEDULE" but A-606 and A-607 are not in the set.

Recommended Fix:

Include A-606/A-607 in the set or correct the note to actual sheet locations.

Symbol legend missing for custom symbols

A-103Page 5MINOR

Custom symbols on A-103 are not defined in legend.

Recommended Fix:

Add symbol legend on cover or discipline sheet.

Detail reference bubble points to wrong sheet

A-202Page 11MINOR

Detail 4/A-202 references S-402 but detail is on S-401.

Recommended Fix:

Correct detail reference to S-401 or move detail.

Corridor assembly does not comply with IBC

A-201Page 18MINOR

Corridor wall at grid B not labeled per IBC; may not meet required rating.

Recommended Fix:

Verify and label fire rating per IBC Table 1020.1.

Roof plan keynotes have placeholder/blank items

A-301Page 21MINOR

Roof plan keynote list includes blank or placeholder entries; set is incomplete.

Recommended Fix:

Complete keynote set and remove placeholders before issuance.

Cross-sheet reference to missing sheets

A-602Page 34MINOR

Schedule references hardware sheets A-606/A-607 which are not in the set.

Recommended Fix:

Add referenced sheets or update note to match sheets provided.